Residential property owners have the opportunity to repair, replace, or install sidewalks at bulk quantity rates. This voluntary program enables residential property owners to:
- Replace all or part of an existing public sidewalk or driveway apron
- Install a new public sidewalk where none currently exists
- Reset or replace bluestone sidewalks
Only perimeter sidewalks (that run parallel to the street) are eligible for this program.
How the Program Works
- Submit the application form below, including a property sketch.
- A Borough representative will inspect your property and give you a cost estimate for the work to be done.
- If you decide to go ahead with the job, you will be asked to sign a contract outlining the terms and conditions of payment. You must return the signed agreement or cancel your application in writing within 10 days.
- The Borough will advertise and award the construction contract.
- The Borough’s representative will examine the property and work designated in the application and inspect the final construction.
Payment Options
Administrative and improvement costs will be billed to the applicant for payment:
- 1 lump sum payment (required for repairs under $1,000)
- 1 payment per year for 3 years (interest will accrue on the outstanding balance)
Note: Some portions of the work you will be assessed for may need to be rebuilt at a later date by the Borough as part of a road project. There is no compensation to the owner by the Borough as a result of this replacement.
Street Trees
Every effort will be made to save the street tree(s) in front of your home. If the tree(s) must be removed in the process of constructing the sidewalk, the homeowner may purchase replacement trees. The Department of Public Works (DPW) must approve the tree species and size. DPW staff can install the trees free of charge.
The other option is to inquire about upcoming roadway improvement projects, through which trees may be purchased and planted at no cost to the homeowner.
Application Form
|
Contact Information
Brendan Nally
Assistant to the Engineer
908-704-2490
bnally@somervillenj.org
|